A82
In August 2011, John Grieve, owner of Lochleven Shellfish Company, attempted to challenge Transport Scotland’s plans to close the A82 overnight five days a week, for a period of up to three weeks, around the village of Onich, between Glencoe and Fort William. Because most of the A82 is single carriageway, and the local geography means a detour can be a significant distance, there is a history of strong protest about closing the road. Former Scottish First Minister Alex Salmond stated whilst in office that the government is “committed to improving the A82”, and he allocated £500,000 in June 2011 to study key areas where the route could be improved. The current diversion over the Friars Bridge towards the modern A9 opened in 1986, in co-ordination with the redevelopment and extension of Inverness docks in the early 1980s and the rerouting of the A9 onto the Kessock Bridge. Work was delayed following a disagreement with the Scottish Ministry of Transport and local councils over funding. The current alignment began construction in 1927, and included a general widening of the carriageway from Tyndrum to Glencoe to 18 feet (5.5 m).
From Glasgow to Dalnottar, the route is now the responsibility of Glasgow City Council and West Dunbartonshire Council in their respective areas. The A82 was one of the first trunk roads, which were created in 1936, and has historically been described in official government documentation as part of the “London – Carlisle – Glasgow – Inverness Trunk Road” in which the A6 and A74 made up the rest of the route. Summary of construction impacts
His plans were never implemented, though that route eventually formed part of the West Highland Railway. Telford himself had proposed a completely alternative route, running to Spean Bridge via Loch Treig and Glen Spean. The current alignment was constructed because Telford’s road had continual problems with the loch flooding. On 16 May 1934, the road was rerouted to run along Buchanan Street, New City Road and Great Western Road, whose westward extension from Anniesland Cross had been recently completed.
Disruption due to construction 5.6. Bridge construction 3.6.5. Road improvements 3.5.
It links up several settlements including Crianlarich, Glencoe, Fort William, Fort Augustus, and Inverness. The A82 is one of Scotland’s longest roads, stretching for 175 miles from Glasgow to Inverness through the west of Scotland. In 2015, a section of the A82 between Invermoriston and Drumnadrochit closed following a rockfall, requiring an official detour of 120 miles (190 km). In April 2013, Transport Scotland announced further plans to close the A82 at Onich for resurfacing, but they postponed the work due to an adverse reaction from local business owners. The Scottish Herald reported that, if the road closed, a journey from Oban to Fort William, normally 44 miles (71 km), would require diverting via Loch Tay and Ballinluig, a journey of 166 miles (267 km).
The route as far as Tarbet has been upgraded to a modern standards, but between Tarbert and Ardlui, is unimproved and congested during busy periods. After bypassing Alexandria, the dual carriageway ends, proceeding as single carriageway for the next hundred miles. It becomes dual carriageway at Garnavel Hospital, the start of a boulevard type road constructed in the late 1920s. It passes several notable Scottish landmarks including Loch Lomond, Rannoch Moor, Loch Ness and the Caledonian Canal. A route through the moor was followed A82 Dalnottar-Inverness Trunk Road – A82 Ba Bridge Replacement – Environmental Statement 2009 by Major William Caulfeild, and a later route was constructed by Telford.
The bypass, known as the Inverness Trunk Road Link (TRL), is aimed at resolving Inverness’s transport problems and has been split into two separate projects, the east and west sections. For the next 30 miles the road runs across the desolate Rannoch Moor with long straights and little habitation. The route becomes a trunk road at the A898 Dalnottar Interchange, before bisecting Dumbarton. The 30-mile section from Balloch to Tarbet was reconstructed in the 1980s and a further improvement at Pulpit Rock was completed in 2015. Many sections of Telford’s road took a new alignment, most notably along the western banks of Loch Ness. The first road to be constructed in the corridor of the existing road dates from the early 1700s, with work overseen by General George Wade.
The modern A82 splits from Telford’s route just before the Clachaig Inn, a popular location for tourists due to its proximity to the site of the Massacre of Glencoe, as noted by a sign in the reception that reads, “No hawkers or Campbells”. The north end of the loch is at Ardlui, after which the A82 continues to follow the Highland Line along Glen Falloch, a typical glacial valley, towards Crianlarich. The road was widened in 2015 as part of a £9 million improvement programme, including a new viaduct bringing the carriageway width to modern standards. At Tarbet, the A83 branches west to Campbeltown while the A82 continues to the north end of the loch. At 167 miles (269 km), the A82 is the second longest A-road in Scotland, after the A9, and has been described as the “slower but more scenic route” of the two. Some sections are occasionally closed for maintenance, which has resulted in strong protest from the local community, and the road has been criticised for its poor accident record.
